Beneath the streets of Liverpool, engineers are drilling into Victorian railway tunnels in a £3.5m effort to stop water disrupting Merseyrail services.
The work, which has closed part of the Northern Line for almost four weeks, is designed to prevent water damaging the network's electrified rail and causing future faults.
Inside St James Tunnel, south of Liverpool Central, engineers are drilling into the curved brick roof before injecting resin into the structure to create a waterproof barrier.