Marcos admin's infra budget set at P1.47-T for 2027—DBM
The Department of Budget and Management (DBM) on Thursday said the Marcos administration has set a P1.47 trillion budget for its “Build Better More” infrastructure initiative under the proposed P7.2-trillion National Exp
লেখক TED CORDERO,GMA News··25K বার পড়া
Marcos admin's infra budget set at P1.47-T for 2027—DBM
The Department of Budget and Management (DBM) on Thursday said the Marcos administration has set a P1.47 trillion budget for its “Build Better More” infrastructure initiative under the proposed P7.2-trillion National Expenditure Program (NEP) in 2027, as the government aims to stimulate economic activity and support jobs generation.
In a statement, the DBM said the P1.47-trillion budget for infrastructure is equivalent to 4.4% of gross domestic product (GDP).
It was also higher by 13.8% or P178 billion than the P1.29 trillion budget under the 2026 General Appropriations Act (GAA).
Bulk of the proposed infrastructure budget next year, or 42.2%, is allocated for the Department of Public Works and Highways (DPWH) at P619.04 billion.
Jobs economic opportunities
The Budget Department said the higher public infrastructure spending in 2027 is expected to help sustain economic growth, generate jobs, reduce logistics and travel costs, and strengthen connectivity across the country.
“More than investing in railways, public transport systems, ports, or airports, these also show that investing in shorter travel times, lower logistics costs, stronger regional connectivity, and greater access to jobs and economic opportunities for our people are important priorities of this administration,” said Budget Secretary Kim Robert de Leon.
For next year, the DPWH’s entire proposed budget was set at P643.95 billion, 21.29% or
P113.05 billion higher than its P530.90-billion budget under this year’s GAA.
“For DPWH specifically, its proposed P643.95 billion allocation is 21.29% higher than its FY 2026 GAA level, driven in part by ongoing locally funded and Foreign-Assisted Infrastructure Flagship Projects,” said Budget Secretary Kim Robert de Leon.
The DBM noted that the higher infrastructure allocation is accompanied by safeguards beginning at the budget preparation stage, with infrastructure proposals undergoing evaluation and validation before they are considered for inclusion in the NEP.
It said that, consistent with the FY 2027 Budget Call and Budget Priorities Framework, the proposed projects are assessed based on their alignment with national and regional development priorities, implementation readiness, project maturity, absorptive capacity and past utilization performance, expected outcomes, and overall value to the Filipino people.
For infrastructure projects, agencies are likewise required to submit complete and sufficient project information and supporting documents to establish their necessity and readiness for implementation, the DBM said.
The Budget Department added that depending on the nature and stage of the project, these may include feasibility studies and detailed engineering requirements, procurement plans, right-of-way requirements, necessary clearances and permits, proof of coordination with concerned LGUs and implementing entities, and certification against project duplication, among other requirements.
The DBM said region-specific programs and projects also undergo the Regional Development Council (RDC) process, where applicable, to ensure that proposed investments are aligned with regional development plans and priorities and have undergone consultation and coordination at the regional level.
It said that the RDC endorsements form part of the supporting requirements considered during the evaluation of agency budget proposals.
The DBM said it also considers the implementing agency’s absorptive capacity and budget utilization performance in determining whether additional appropriations can realistically be implemented and disbursed within the fiscal year.
The Budget Department said projects subsequently funded under the national budget remain subject to applicable procurement, budgeting, accounting, auditing, monitoring, and transparency requirements throughout implementation.
Flagship projects
The DBM also listed the following major Infrastructure Flagship Projects supported under the proposed FY 2027 allocation:
Laguna Lakeshore Road Network Project
Bataan-Cavite Interlink Bridge Project
Davao City Bypass Construction Project, Package I
Cebu-Mactan Bridge and Coastal Road Construction Project
Pasig-Marikina River Channel Improvement Project, Phase IV
The DBM said the Laguna Lakeshore Road Network Project received the largest allocation among the five at P35.21 billion.
The project involves the construction of a 37.6-kilometer primary road from Lower Bicutan to Calamba and is targeted for completion in 2028. It is supported by the Asian Development Bank (ADB), Asian Infrastructure Investment Bank (AIIB), and Korea’s Economic Development Cooperation Fund (KEXIM-EDCF).
Another P22.49 billion is earmarked for the Bataan-Cavite Interlink Bridge Project, a 32.15-kilometer, four-lane bridge across Manila Bay linking Mariveles, Bataan and Naic, Cavite.
Supported by the Asian Development Bank and Asian Infrastructure Investment Bank, the project has been approved for implementation.
In Mindanao, P11.96 billion is earmarked for Package I of the Davao City Bypass Construction Project, an ongoing Japan-assisted project involving a 45.5-kilometer, four-lane bypass road in Davao City. It is targeted for completion in 2028.
For Central Visayas, P8.57 billion is provided for the Cebu-Mactan Bridge and Coastal Road Construction Project, covering a 3.34-kilometer bridge and the 5.34-kilometer Mandaue Coastal Road.
The Japan-supported project has been approved for implementation and is targeted for completion in 2030.
The proposed FY 2027 budget also provides P8.54 billion for the Pasig-Marikina River Channel Improvement Project, Phase IV, an ongoing Japan-assisted water resources project covering the National Capital Region and Region IV-A, according to the DBM.
The agency said the project involves channel improvement works for the Middle Marikina River, including the Manggahan Control Gate Structure and two floodgates where the Cainta and Taytay rivers join the Manggahan Floodway. —VAL GMA News