The Mumbai-Ahmedabad High-Speed Rail Corridor is incorporating canted turnouts and movable crossings to enable India’s first bullet train to switch tracks at speeds up to 320 kmph without experiencing mechanical jolts.
This advanced infrastructure eliminates the conventional open physical gaps found on standard tracks, ensuring a continuous running surface and minimizing lateral forces.